QUALITY & VALIDATION

Quality documents and component inspection

We preserve the link between material grade, converted part, drawing revision, test condition and production record throughout project review and manufacturing.

Define your validation inputs

FACTORY CERTIFICATE RECORDS

Certificate copies from our factory profile

These original copies show the issuing organization, factory entity, scope and dates. For purchasing approval, request the current certificate and scope confirmation from Leo.

FACTORY PROFILE RECORD

IATF 16949

Automotive-quality system supporting disciplined planning, change control and production management.

FACTORY PROFILE RECORD

ISO 9001

Quality-management framework for controlled processes, records and continual improvement.

FACTORY PROFILE RECORD

ISO 14001

Environmental-management framework supporting managed operational impacts.

SUPPLIER QUALIFICATION

Certificate and manufacturing scope review

Our factory profile includes IATF 16949, ISO 9001 and ISO 14001 records. Contact Leo for current certificate copies, validity and scope confirmation for your supplier review. Legal factory details are shared privately.

Request certificate copies

PRODUCTION CONTROL

Controls follow the part from material receipt to shipment.

The final plan is defined around drawing characteristics, process risks, program stage and customer-specific requirements.

01

Incoming material

Material identity, supplier documentation and project-defined incoming checks.

02

First article

Drawing dimensions, construction, appearance and handling features before routine production.

03

In-process inspection

Defined checkpoints aligned with critical dimensions and process stability.

04

Final release

Project-agreed sampling, dimensional records and packaging verification.

05

Traceability

Material lot, production record and drawing revision retained to the agreed project level.

06

Change control

Material, supplier, tooling or process changes handled through the agreed approval path.

VALIDATION STAGES

Evidence from material selection through production release.

Each stage confirms a different part of the material, component, application and production decision.

  1. 01

    Material-family evidence

    Supplier data and screening values help compare candidates.

  2. 02

    Converted-part evidence

    Dimensions, construction and handling are verified on the finished component.

  3. 03

    Application evidence

    The customer validates the installed part under representative load, aging and safety conditions.

  4. 04

    Release evidence

    The approved drawing, control plan and project records define ongoing production acceptance.

SYSTEM-LEVEL VALIDATION

Component evidence supports the complete battery validation plan.

Management-system certificates describe the controlled manufacturing system. Part, material and battery-level performance is confirmed through the applicable grade, construction and cell, module, pack or ESS test program.

Copies, scopes and current status of management-system certificates are supplied during qualified project review where relevant.

Need a control plan, sample record or validation discussion?

Tell us the program stage and evidence your team needs.

Contact Leo Lam